No
|
Client
|
Scope of
Work
|
Year
|
|
1
|
PT
BAPIPPUNDIP
SEMARANG |
Assessment
for capacity expansion of Pakis Baru SF from 1000 TCD to
1800 TCD |
1981
|
|
2
|
PT
PERKEBUNANXV-XVI
SOLO |
Feasibility
Study, for the construction of Cempaka sugar project, South
Sumatra (in association
with John H. Payne & Ass. of Hawaii. |
1981
|
|
3
|
PT
PERKEBUNANXXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study, for the construction of Ketapang sugar project,
Lampung (in
association with John H. Payne & Ass. of Hawaii. |
1982
|
|
4
|
PT
PERKEBUNAN XX
(PERSERO) SURABAYA |
Feasibility
Study, for the construction of Ladongi sugar project,
South East Sulawesi (in
association with John H. Payne & Ass. of
Hawaii. |
1982
|
|
5
|
PT
RAJAWALI
NUSANTARAINDONESIA
(PERSERO)SURABAYA
|
Field
Design for Los Palos new sugar project, East Timor
(in association with Sugar
Knowledge International Limited of
England). |
1982
|
|
6
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for Cinta Manis sugar project, South Sumatra
(in association with John
H. Payne & Ass. of Hawaii. |
1982
|
|
7
|
PT
BAPIPPUNDIP
SEMARANG |
Implementation
& Construction Management Services for the
expansion of Pakis Baru SF
from 1000 TCD to 1800 TCD
|
1982-1984
|
|
8
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for capacity expansion of Gempolkrep SF, Mojokerto
from 3600 TCD to
5000 TCD |
1983
|
|
9
|
BANK
BUMI DAYA,
JAKARTA |
Supervision
for the construction of Bunga Mayang (Ketapang)
sugar project, Lampung |
1983-1984
|
|
10
|
BANK
BUMI DAYA,
JAKARTA |
Supervision
for the construction of Cinta Manis sugar project, South
Sumatra |
1983-1984
|
|
11
|
PT
PERKEBUNAN
XXIV-XXV (PERSERO)
SURABAYA |
Implementation
Consultancy Services for the construction of NES-I
Sugar Pelaihari (IBRD
fund), South Kalimantan (in association with
Tate & LyleTechnical
Services of England)
|
1984-1986
|
|
12
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for capacity expansion of Ngadirejo SF, from 1800
TCD to 3600 TCD |
1984
|
|
13
|
PIMPRO
PROGRAM
BANTUANDANA ALOKASI
DATI I - JATIM |
General
Planning for the township of Kediri
|
1984
|
|
14
|
PIMPRO
PROGRAM
BANTUANDANA ALOKASI
DATI I - JATIM |
General
Planning for the township of Malang
|
1984
|
|
15
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for capacity expansion of Bunga Mayang, Lampung
from4000 TCD to 6000
TCD
|
1984-1985
|
|
16
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for capacity expansion of Cinta Manis SF, South
Sumatra from 4000 TCD
to 6000 TCD
|
1984-1985
|
|
17
|
MARUBENI
CORPORATION
TOKYO, JAPAN |
Second
Opinion on Process Technology and Performance Test of
Cinta Manis SF
|
1984
|
|
18
|
KAWASAKI
HEAVY
INDUSTRY,KOBE - JAPAN
|
Second
Opinion on Process Technology and Performance Test of
Bunga Mayang SF
|
1984
|
|
19
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Project
Supervision for capacity expansion of Bunga Mayang SF,
Lampung |
1985-1987
|
|
20
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for capacity expansion of 3 sugar factories:Krian,
Tulangan and
Kremboong |
1986
|
|
21
|
PT
PERKEBUNAN XIV
(PERSERO) CIREBON |
Feasibility
Study for capacity expansion of Tersana Baru SF, West
Jawa |
1986
|
|
22
|
PT
PERKEBUNAN XIV
(PERSERO) CIREBON |
Feasibility
Study for capacity expansion of Subang SF, West Jawa
from 3000 TCD to 4000
TCD
|
1986
|
|
23
|
PT
PERKEBUNAN XIV
(PERSERO) CIREBON |
Feasibility
Study for capacity expansion of Jatitujuh SF, West Jawa
|
1986
|
|
24
|
PIMPRO
PROGRAM
BANTUANDANA ALOKASI
DATI I - JATIM |
General
Planning for the township of Pamekasan
|
1986-1988
|
|
25
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Update Study for capacity expansion of Cinta Manis SF,
South Sumatra |
1987
|
|
26
|
PT
PG TJANDI SIDOARJO
|
Feasibility
Study for capacity expansion of Tjandi SF, Sidoarjo
|
1987
|
|
27
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for capacity expansion of Watutulis SF and updating
the feasibility
study of Gempolkrep SF |
1987
|
|
28
|
PT
PERKEBUNAN IX
(PERSERO) MEDAN |
Feasibility
Study for capacity expansion of Kuala Madu SF, from 4000
TCD to 5000 TCD |
1987
|
|
29
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for capacity expansion of Mojopanggung SF
|
1987
|
|
30
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for capacity expansion of all sugar factories in
ex Kediri Regency |
1987
|
|
31
|
LEMBAGA
PENDIDIKAN
PERKEBUNAN -YOGYA |
Trainning
for Management Advisory Services, in association with
Tate & Lyle
Technical Services of England (IBRD fund) |
1987
|
|
32
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Assistances
for the completion of the Long Range Plan (1988-1992)
for PTP XXI-XXII and
the twelve (12) sugar factories |
1988
|
|
33
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Feasibility
Study for capacity expansion of Bunga Mayang SF,
Lampung from 6000 TCD to
10000 TCD |
1988
|
|
34
|
PT
BAPIPPUNDIP
SEMARANG |
Feasibility
Study for capacity expansion of Pakis Baru SF,
Pati - Central Jawa from 2100
TCD to 3000 TCD, and supervision for
1990 milling season |
1989-1990
|
|
35
|
PT
PERKEBUNAN
XXIV-XXV (PERSERO)
SURABAYA |
Feasibility
Study for Go Public of PT Perkebunan XXIV-XXV
(Persero),including the study
for capacity expansion of four (4)
sugar factories, Asembagus, Prajekan,
Semboro and Jatiroto
|
1991
|
|
36
|
PT
INDACO GROUP
SURABAYA |
Bagasse
& Molasses Production Survey for three (3) sugar factories in
South
Sulawesi, Bone, Camming and Takalar |
1991
|
|
37
|
PP.
CEMARA AGUNG
SIDOARJO |
Introduction
of Environment Information for Chromium Plating Plant
in Gedangan - Sidoarjo
|
1991
|
|
38
|
PT
NOOR SAKTI
UTAMA SIDOARJO
|
Introduction
of Environment Information for the manufacture of
Tin Bars for Soldering in
Sidoarjo |
1991
|
|
39
|
PT
INDO AMPLAS
UTAMA SIDOARJO
|
Introduction
of Environment Information for theAbrasive Paper &
Linen Industry in
Gedangan, Sidoarjo |
1991
|
|
40
|
PT
PERKEBUNAN
XXIV-XXV(PERSERO)
SURABAYA |
Environment
Evaluation Studies of four (4) sugar factories,
Asembagus, Panji, Prajekan
and De Maas (SEL, RKL & RPL)
|
1992-1993
|
|
41
|
GENTECH
ENGINEERING
& TRADINGCO. LTD.
TAIPEI TAIWAN |
Commissioning
Services for Naga Manis Plantation SF, Gorontalo,
North Sulawesi |
1992
|
|
42
|
PT
PERKEBUNAN XXI-XXII
(PERSERO) SURABAYA |
Workshop
for computerized mill setting uses mill material balance
|
1992
|
|
43
|
PT
RAJAWALI
NUSANTARA INDONESIA
(PERSERO) SURABAYA
|
Workshop
for computerized mill setting uses mill material balance
|
1993
|
|
44
|
PT
PERKEBUNAN XXXII
(PERSERO) UJUNG
PANDANG |
Workshop
for computerized mill setting uses mill material balance
|
1993
|
|
45
|
PT
PERKEBUNAN
XXIV-XXV (PERSERO)
SURABAYA |
Workshop
for computerized mill setting uses mill material balance
|
1993
|
|
46
|
PT
RAJAWALI NUSANTARA
INDONESIA(PERSERO)
SURABAYA |
Supervision
and guidance for mill performance monitoring of Rejo
Agung Baru SF, Madiun |
1993
|
|
47
|
PT
PERKEBUNAN
XXI-XXII (PERSERO)
SURABAYA |
Supervision
and duidance for mill performance monitoring of
Meritjan SF and Pesantren
Baru SF, Kediri |
1993
|
|
48
|
PT
PERKEBUNAN
XXI-XXII (PERSERO)
SURABAYA |
Feasibility
Study for capacity expansion of Ngadirejo SF, from 4800
TCD to 10000 TCD |
1994
|
|
49
|
PT
PERKEBUNAN XXXII
(PERSERO) UJUNG
PANDANG |
Feasibility
Study for the Long Range Plan (1994-1998), including
the rationalization and
consolidation of three (3) sugar factories,
Bone, Camming and Takalar |
1994
|
|
50
|
PT
PERKEBUNAN XXXII
(PERSERO) UJUNG
PANDANG |
Training
of Practical Manajemen & AdministrationOperasion for
head office and
sugar factories staffs |
1994
|
|
51
|
PT
PERKEBUNAN XX
(PERSERO) SURABAYA |
Performance
Evaluation (Technology & Financial) of Kanigoro SF
and Sudhono SF, Madiun |
1994
|
|
52
|
PT
RAJAWALI
NUSANTARA INDONESIA
(PERSERO) SURABAYA
|
Advisory
Service for increasing the performance of mill station of
RejoagungBaru SF,
Madiun
|
1994-1995
|
|
53
|
PT
KEBON AGUNG
SURABAYA |
Project
Supervision for the construction and erection of a new
Takuma steam boiler,
60 tons/hr at Trangkil SF, Pati
|
1994-1995
|
|
54
|
PT
KEBON AGUNG
SURABAYA |
Technical
Supervision & Advisory Service for milling season 1995
of Kebon AgungSF
and workshop for computerized mill setting uses
mill material balance |
1994-1995
|
|
55
|
PT
CITRALAND SURYADi
Lakarsantri dan
Driyorejo - SURABAYA |
In
associatiom with PT Deserco DS, for detail eng. Design and
supervision of the River Water Pump Station incld. Pipings for Golf
Course and Clean Water
Supply
|
1994-1995
|
|
56
|
PT
PERKEBUNAN XXXII
(PERSERO) – U’Pandang |
Joint
Operation with PT Melinco Graha, Revaluation and Re-drawn
the Electrical
Power System of SF Bone
|
1995
|
|
57
|
PT
PERKEBUNAN XX
(PERSERO) SURABAYA |
Workshop
for computerized mill setting uses mill material balance
|
1995
|
|
58
|
PT
PERKEBUNAN XX
(PERSERO) SURABAYA |
Advisory
Service for performance test of equipment from Cot Girek SF
installed at
Pagottan SF
|
1995
|
|
59
|
PT
PERKEBUNAN XX
(PERSERO) SURABAYA |
Advisory
Service for mill station operation and monitoring for all the
sugar factories
underPTP-XX
|
1995
|
|
60
|
PT
PERKEBUNAN
XXIV-XXV
(PERSERO) SURABAYA
|
Environmental
Study (Amdal) for UKL & UPL of Lavalette public
hospital, Malang
|
1996
|
|
61
|
PT
PERKEBUNAN
XXIV-XXV
(PERSERO) SURABAYA
|
Survey
& Evaluation for the Investment plan of Jatiroto SF and
PagottanSF
|
1996
|
|
62
|
PT
PERKEBUNAN
NUSANTARA X
(PERSERO) SURABAYA
|
Technical
Supervision for the Erection Work of Takuma Steam Boiler
of 75 tons/.hour at
SF Lestari - Kertosono
|
1996-1997
|
|
63
|
PT
CITRALAND SURYA
SURABAYA,GOLF
COURSE |
In
association with PT Melinco Graha for detail engineering design,
including
drawings,technical spec.s, bill of quantities
(tender document) andtechnical advisory services during construction
period for: a.River Water
Pump Station b.M & E for supermarket &
Shopping Arcades c Golf Course
lighting system
|
1996
|
|
64
|
PT
WAHANA SAMPOERNA
SURABAYA, CIGARETTE
FACTORY |
In
association with PT Melinco Graha for detail engineering design,
including
drawings, technical spec.s, bill of quantities
(tender document) andtechnical advisory services during construction
period for: a.Clove Processing Plant b.Tobacco Preparation Plant c.
Tobacco Extraction Plant
|
1996
|
|
65
|
PT
PERKEBUNAN
NUSANTARA X
(PERSERO) SURABAYA
|
Project
Supervision for the construction and erection of a new
Takuma steamboiler of75 tons/hr at Lestari SF, Kertosono
|
1996-1997
|
|
66
|
PT
PERKEBUNAN
NUSANTARA X
(PERSERO) SURABAYA
|
Design
& Supervision for the construction and erection of one (1) set
mill crane
2 x 25tons in Gempolkrep SF
|
1997-1998
|
|
67
|
PT
PERKEBUNAN
NUSANTARA XI
(PERSERO) SURABAYA
|
The
Strategy and Business Plan Study (The Long Range Plan of
(1997-2001),including the performance audit of seventeen (17)
sugar factories,four (4)public hospitals, two (2) alcohol and spirits
distilleries and one (1) jute
bagfactory(in association with John H.
Payne Inc. of Hawaii). |
1997
|
|
68
|
PT
LITECHINDO UTAMA
SURABAYA,GLASS FOR
ELECTRIC LAMP
FACTORY |
In
association with PT Andhani Bina Surya for detail engineering
design,includingdrawings, technical specifications, tender document
for Mechanicaland ElectricalWorksand technical advisory services.
|
1997-1998
|
|
69
|
PT
PERKEBUNAN
NUSANTARA X
(PERSERO) SURABAYA
|
Intensive
training for Mill Experts from all sugar factories of PTPN-X.
|
1998
|
|
70
|
PT
PERKEBUNAN
NUSANTARA XI
(PERSERO) SURABAYA
|
Sugar
Refinery Project of SF Kedawoeng, includes:
a. Preliminary
Design
b. Feasibility
Study
c. Tender
Document
d. Technical
Advisory Services.
|
1998-1999
|
|
71
|
PT
PERKEBUNAN
NUSANTARA X
(PERSERO) SURABAYA
|
Intensive
training for the Staff personnel in:
a. Preparing project proposal
b.
Operation and maintenance of steam boiler and steam turbine
|
1999
|
|
72
|
PT
HM SAMPOERNA Tbk.
|
Standardization
Training for Electric Power Installation
|
1999
|
|
73
|
PT
SASA INTI
GENDING - PROBOLINGGO |
Electric
Power System Design for rehabilitation and extension,
including tender document.
|
2000-2001
|
|
74
|
PT
PERKEBUNAN
NUSANTARA XI
(PERSERO) SURABAYA
|
Intensive
training for Mill Experts from all sugar factories of PTPN-XI.
|
2001
|
|
75
|
THE
HYATT REGENCY
SURABAYA |
Re-design
of the existing steam and hot water plant utilities.
|
2001
|
|
76
|
PT
PERKEBUNAN
NUSANTARA XI
(PERSERO) SURABAYA
|
Feasibility
Study for Credit to Cane Farmers of PTPN-XI sugar
factories. |
2001
|
|
77
|
PT
DHARMALA-RSEA
Ngoro Industri
Persada(Industrial Estate)
|
Modification
Planning & Construction Supervision for Central Waste
WaterTreatment
Plant
|
2001
|
|
78
|
PT
CIPUTRA SURYA
|
Engineering
Design for the Development of Water Purification &
Golf Course(in
association with PT Indulexco).
|
2002
|
|
79
|
PT
PERKEBUNAN
NUSANTARA XI
(PERSERO) SURABAYA
|
Feasibility
Study for the Relocation of Kawasaki Steam Boiler of 30
tons/hr fromPT
Kertas Basuki Rachmat, Banyuwangi to SF Djatiroto
|
2002
|
|
80
|
PT
PERKEBUNAN
NUSANTARA XI
(PERSERO) SURABAYA
|
Feasibility
Study for a Joint Venture of Ethanol Project at Djatiroto
with GeniusPower, Gas & Oil Co. Ltd. of China
|
2002
|
|
81
|
PT
PERKEBUNAN
NUSANTARA XI
(PERSERO) SURABAYA
|
In
Association with Booker Tate Indonesia; Desk Study for Relocation
of Pelaihari SF to Tinanggea or Assembagoes
|
2003
|
|
82
|
PT
PERKEBUNAN
NUSANTARA XI
(PERSERO) SURABAYA
|
In
association with ISEI Business Research & Development (IBRD)
Surabaya;
Long Terms Planning (RJP) 2003–2007.
|
2003
|
|
83
|
PT
PERKEBUNAN
NUSANTARA XI
(PERSERO) SURABAYA
|
Desk
Study for the Empowering and Outsourcing of Pelaihari SF’s
Asset. |
2003
|
|
84
|
PT
PERKEBUNAN
NUSANTARA XI(PERSERO)
|
Akselerasi
peningkatan produksi & produktivitas PG Jatibarang & PG
Gondang Baru |
2004
|
|
85
|
PT
CITRA RAYA KOTA
MANDIRI SURABAYA
BEKERJASAMA DENGAN
PT INDULEXCO |
Mechanical
Electrical - Water Park Citraland
|
2004
|
|
86
|
PT
PG RAJAWALI
NUSANTARA II(RNI GROUP)
-CIREBON |
Akselerasi
peningkatan produksi & produktivitas PG Tersana Baru&
PG Jati Tujuh
|
2004
|
|
87
|
PT
PERKEBUNAN
NUSANTARA IX
(PERSERO) |
Akselerasi
peningkatan produksi & produktivitas PG Djatiroto
|
2004
|
|
88
|
PT
KEBUN AGUNG
|
Kajian
Upaya Peningkatan Efisiensi Pabrik dan Penekanan
Pemakaian minyak bakar di PG
Kebon Agung, Malang
|
2004
|
|
89
|
PT
KEBUN AGUNG
|
Desk
Study Kajian Kapasitas Peralatan PG Trangkil dan PG Kebon
Agung |
2004
|
|
90
|
PT
KEBUN AGUNG
|
Kajian
Ketersediaan dan Pasokan Bahan Baku (Tebu) di Wilayah
Kerja PG PT Kebon Agung
|
2004
|
|
91
|
DEWAN
GULA INDONESIA
|
Kajian
Prospek Agribisnis Tebu di Pulau Jawa samapai tahun 2020
|
2004
|
|
92
|
PT
KEBUN AGUNG
|
Pelatihan
Karyawan PG Trangkil dan PG Kebon Agung
|
2004
|
|
93
|
PT
KEBUN AGUNG
|
Supervisi
Pemasangan Ketel Uap di PG Kebon Agung
|
2004
|
|
94
|
PT
PERKEBUNAN
NUSANTARA IX
(PERSERO) |
Supervisi
In House Training
|
2005
|
|
95
|
PT
ALINDOJAYA SEMBADA
|
Prasurvey
Proyek Pabrik Gula Rafinasi di Lampung
|
2005
|
|
96
|
PT
CIPUTRA SURYA
TBK. S’BY |
Technical
Advixory Services untuk pelaksanaan Proyek Water
Park – Citra Raya |
2005
|
|
97
|
PT
PERKEBUNAN
NUSANTARA X
(PERSERO) |
Kajian
peningkatan PG Gempolkerep dari kapasitas 5500 TCD
menjadi 8000TCD
|
2005
|
|
98
|
PT
PERKEBUNAN
NUSANTARA IX
(PERSERO) |
Pekerjaan
Kerjasama in House Training
|
2005
|
|
99
|
PT
PERKEBUNAN
NUSANTARA VII
(PERSERO) |
Kajian
Peningkatan Kapasitas Pabrik Gula Unit Usaha
Bungamayang |
2005
|
|
100
|
PT
PERKEBUNAN
NUSANTARA VII
(PERSERO) |
Kajian Upaya
Menekan Pemakaian BBM untuk Boiler di Pabrik
Gula PTPN-VII (Persero)
|
2005
|
|
101
|
PT
KARYA KOMPOS
BAGAS |
Uji Coba (Commisioning) Boiler Batu
Bara
Kapasitas
30 Ton/Jam di
PGMeritjan dan PG Djombang Baru
|
2005
|
|
102
|
PT
ARTA KENCANA
AGUNG |
Updating Studi Kelayakan Pembangunan Pabrik Gula
PT Industri
Gula Tinanggea KabupatenKonawe Selatan Propinsi Sulawesi
Tenggara |
2005
|
|
103
|
PT
KEBON AGUNG
|
Perencanaan dan Pengawasan Pembangunan
Turbin Generator
6.000 V – 4.500 KW – di PG Kebon Agung
|
2006 - 2007
|
|
104
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Pengawasan Pembangunan Rehabilitasi Gedung
kantor Direksi di
Surabaya |
2006
|
|
105
|
PT
KEBON AGUNG
|
Supervisi Proyek Pembangunan Ketel
Uap
100
T/jam - di PG
Trangkil-Pati |
2006 - 2007
|
|
106
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Pengawasan Pembangunan Vac.Filter,
Plate
Evaporator,
Vac.Pan,
Juice Heater, Low dan Hign Grade Fugal di PG Gempol kerep.
|
2006
|
|
107
|
PT KENCANA LESTARI
KONSULTAN (KLK) –
WATER PARK
CENTURY
HILL -
BANDUNG |
Perencanaan Water Park meliputi :
Bidang
Struktur,
Arsitektur, Water
Management, M&E, dan Dokumen Tender l/d
Gambar
|
2007
|
|
108
|
PT KENCANA LESTARI
KONSULTAN (KLK) –
WATER PARK –
CIBUBUR JAKARTA |
Perencanaan Water Park meliputi :
Bidang
Struktur,
Arsitek, Water
Management, M&E, dan Dokumen Tender l/d
Gambar
|
2007
|
|
109
|
PT KENCANA
LESTARIKONSULTAN
(KLK) –WATER PARK
MENADO |
Perencanaan Water Park meliputi :
Bidang
Struktur,
Arsitek,
Water Management, M&E, dan Dokumen Tender l/d
Gambar
|
2007
|
|
110
|
PT
CITRA GARDEN
|
Perencanaan M&E Air Mancur
(Teknik) di
Citra
Garden Sidoarjo
|
2007
|
|
111
|
PT
PABRIK KERTAS
LECES |
Perenc. dan Pengawasan 2 unit Boiler
120
Ton/jam
di Pabrik Ketas
Leces |
2007
|
|
112
|
PT PAKUWON CITY -
SURABAYA
|
Perencanaan Jaringan PLN, PDAM dan Telephone
utk. Pakuwon
Town SquarePakuwon City - Surabaya
|
2007
|
|
113
|
PT PERKEBUNAN
NUSANTARAVII
(PERSERO) |
Studi Kelayakan Peningkatan Kapasitas
UU
Buma
|
2007
|
|
114
|
PT PERKEBUNAN
NUSANTARA VII
(PERSERO) |
Studi Kelayakan Peningkatan Kapasitas
UU
Cima
|
2007
|
|
115
|
PT PERKEBUNAN
NUSANTARA VII
(PERSERO) |
Revisi Updating Studi Kelayakan
Peningkatan
Kapasitas
UU Buma
& UU Cima
|
2007
|
|
116
|
PT PERKEBUNAN
NUSANTARA VII
(PERSERO) |
Peningkatan Kapasitas PG Buma I &
II
Perencanaan
& Dokumen
Tender |
2007
|
|
117
|
PT PERKEBUNAN
NUSANTARA VII
(PERSERO) |
Peningkatan Kapasitas PG Cima I &
II
Perencanaan
& Dokumen
Tender |
2007
|
|
118
|
PT PERKEBUNAN
NUSANTARA VII
(PERSERO) |
Bisnis
Plan UU Buma
|
2007
|
|
119
|
PT PERKEBUNAN
NUSANTARA VII
(PERSERO) |
Bisnis
Plan UU Cima
|
2008
|
|
120
|
PT PERKEBUNAN
NUSANTARA IX
(PERSERO) |
Proyek Meningkatkan
Kinerja PG Gondang Baru
|
2007
|
|
121
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Pengawalan Peningkatan
Rendemen Tebu
masa
giling 2008
PG Meritjan |
2007
|
|
122
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Pekerjaan pembuatan
Study Kelayakan
Peningkatan
Kapasitas
Giling PG Ngadiredjo
|
2007
|
|
123
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Proyek pengawasan
dan pembangunan
gedung
Poliklinik Terpadu
RS Gatoel |
2007
|
|
124
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Pekerjaan pembuatan
Study Kelayakan
Peningkatan
Kapasitas
Giling PG Watoetoelis
|
2007
|
|
125
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Pekerjaan pembuatan
Study Kelayakan
Peningkatan
Kapasitas
Giling PG Pesantren Baru
|
2007
|
|
126
|
PT PERKEBUNAN
NUSANTARA X
(PE128RSERO) |
Pekerjaan pembuatan
Study Kelayakan
Peningkatan
Kapasitas
Giling PG Gempol Kerep
|
2007
|
|
127
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Perencanaan dan Tata
letak Pengadaan dan Pemasangan 1 Unit
Water Tube BoilerKapasitas
120 Ton/jam lengkap denganDemin
Plan PG Ngadiredjo
|
2007
|
|
128
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Pengawalan Percobaan
Uap pada persiapan giling tahun 2008 PG
Kremboong |
2007
|
|
129
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Pengawalan
Individual Test dan General Test peralatan Pabrik tahun
2008 PG Djombang
Baru
|
2007
|
|
130
|
PTPN
X (PERSERO)
|
Pengawalan dan
Pendampingan Individual Test dan General Test
PG Lestari
|
2007
|
|
131
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Jasa Konsultan
Perencanaan Peningkatan Kapasitas Giling PG
Semborodari4.800 TCD
menjadi 7.000 TCD
|
2007
|
|
132
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Jasa Konsultan
Pengawalan Peningkatan Efisiensi dan Produktivitas
masagiling tahun 2008
PG Padjarakan
|
2007
|
|
133
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Jasa Konsultan
Pengawalan Peningkatan Efisiensi dan Produktivitas
masagiling tahun 2008
PG Djatiroto
|
2007
|
|
134
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Jasa Konsultan
Pengawalan Peningkatan Efisiensi dan Produktivitas
masagiling tahun 2008
PG Wonolangon
|
2007
|
|
135
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Jasa Konsultan
Pengawalan Peningkatan Efisiensi dan Produktivitas
masa giling tahun 2008
PG Gending
|
2007
|
|
136
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Jasa Konsultan Pengawalan Peningkatan Efisiensi
dan Produktivitas
masa giling tahun 2008 PG Kedawung
|
2007
|
|
137
|
PT PERKEBUNAN
NUSANTARA X
I(PERSERO) |
Jasa Konsultan Pengawalan Peningkatan Efisiensi
dan Produktivitas
masa giling tahun 2008 PG Semboro
|
2007
|
|
138
|
PT PERKEBUNAN
NUSANTARA X
I(PERSERO) |
Desk Study Kelayakan Relokasi
PGPelaihari
|
2007
|
|
139
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Jasa Pembuatan kajian kelayakan
relokasi
PG
Pelaihari ke proyek
pembangunan PG Baru di Benculuk Banyuwangi
|
2007
|
|
140
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Kajian Empowering dan Outsourcing
asset
PG
Pelaihari
|
2007
|
|
141
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Pembuatan Study Kelayakan proyek
Biogas
–
Gas Methane Pasa
Djatiroto |
2007
|
|
142
|
PT
RAJAWALI
|
Loka karya / Work shop Setelan
Gilingan
PG
Rejo Agung Baru
|
2007
|
|
143
|
PT
RAJAWALI
|
Desk Studi Kajian Kapasitas peralatan
dan
mesin-mesin
PG Rejo
Agung Baru
|
2007
|
|
144
|
PT
RAJAWALI
|
Identifikasi
masalah di PG Krebet Baru I
|
2007
|
|
145
|
PT
RAJAWALI
|
Pengawalan
Vapor Bleeding Krebet Baru I
|
2007
|
|
146
|
PT
KEBON AGUNG
|
Pekerjaan perencanaan dan supervisi
teknis
Pembangunan
Turbo
Generator 4.500 KW |
2007
|
|
147
|
PT
ALFA LAVAL
INDONESIA |
Pre
Design Engineering back up service
|
2007
|
|
148
|
PT BARATA INDONESIA
(PERSERO)
|
Rancang bangun Sistem Proses dan Peralatan
Pabrik Gula
|
2007
|
|
149
|
ITS
FTSP TL
|
Penelitian & Pengembangan PDAM
Kota
dan
Kabupaten Kediri dan
Blitar |
2008
|
|
150
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Pengawalan rutin Peningkatan
Efisiensi dan
Produktivitas
Bidang
Pabrik sisa giling tahun 2007 PG Kedawung |
2008
|
|
151
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Review Study Kelayakan Investasi
Mesin
Benang
Multi Filamen PK
Rosella Baru |
2008
|
|
152
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Pengawalan rutin Peningkatan
Efisiensi dan
Produktivitas
Bidang
Pabrik sisa giling tahun 2007 PG Padjarakan
|
2008
|
|
153
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Pengkajian PG yang memiliki harga
pokok
produksi
diatas Rp.
4.000,-/kg untuk memproduksi Raw Sugar (PG Gending
& PG
Kedawung) |
2008
|
|
154
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Penyusunan FS Peningkatan Kapasitas
PG
Djatiroto
& Semboro
dengan peralatan eks PG Pelaihari
|
2008
|
|
155
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Pengawalan rutin Peningkatan
Efisiensi dan
Produktivitas
Bidang
Tanaman dan Bidang Pabrik masa giling tahun 2008 (PG
Olean,
PG Kedawung, PG Soedono, PG Kanigoro, PG
Wringinanom & PG
Gending) |
2008
|
|
156
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Pengawalan rutin Peningkatan
Efisiensi dan
Produktivitas
Bidang
Pabrik sisa giling th. 2008 PG Gempolkrep
|
2008
|
|
157
|
PT
SUGAR LABINTA
|
Performance Test Pabrik Gula Rafinasi
di
Lampung
|
2009
|
|
158
|
PT PERKEBUNAN
NUSANTARA VII
(PERSERO) |
Pelatihan mengenai Project Management dan
Microsoft Project
(CPM) |
2009
|
|
159
|
PT PERKEBUNAN
NUSANTARA VII
(PERSERO) - LAMPUNG |
Pengawalan dan Pedampingan Persiapan dan
Pelaksanaan Giling
Tahun 2009 UU Bunga Mayang
|
2009
|
|
160
|
PT PERKEBUNAN
NUSANTARA VII
-LAMPUNG |
Pengawalan dan Pedampingan Persiapan dan
Pelaksanaan Giling
Tahun 2009 UU Cinta Manis
|
2009
|
|
161
|
PT PERKEBUNANA
NUSANTARA X
(PERSERO) |
Pengawalan dan Pendampingan Persiapan dan
Pelaksanaan Giling
untuk beberapa Pabrik Gula
|
2009
|
|
162
|
PT PERKEBUNAN
NUSANTARA XI
(PERSERO) |
Feasibility Study Pengembangan Pabrik ETHANOL di
Djatiroto
|
2009
|
|
163
|
PG
MERITJAN - KEDIRI
|
Pelatihan untuk Tenaga Pelaksana
Bidang
Pabrik
dan Bidang
Tanaman |
2010
|
|
164
|
PT
KEBON AGUNG
|
Pengawasan Pembangunan Ketel Uap 120 ton/jam di
PG Kebon
Agung |
2010
|
|
165
|
PT
MOLINDO RAYA
|
Studi Kelayakan Pembangunan Pabrik Ethanol dari
Nira Tebu
|
2010
|
|
166
|
PT PERKEBUNAN
NUSANTARA X
(PERSERO) |
Pengawalan giling PG Lestari, PG
Mrican
&
PG Kremboong
|
2010
|
|
167
|
PT
SURYA SEJAHTERA
|
Pra Studi / Project Proposal
Pembangunan
Pabrik
Gula Kapasitas
6.000 TTH
|
2010
|
|
168
|
PT
TLOGO KELANG
|
Assistensi Pembangunan Pabrik Gula Merah
|
2010
|
|
169
|
PT
KEBON AGUNG
|
Pengawalan
giling PG Trangkil
|
2010
|